This project consists of the groundwork and surveying package for a single dwelling in Edenbridge. We are installing deep pad foundations which will be spanned by universal beams. Drainage will be connected to an existing pumping chamber and storm water to a new PCC soakaway positioned in the garden.
This external works project consists of the preparation for a new bowling, croquet and tennis courts. We are installing all service ducting and drainage as well as all external work finishes including paving and roads.
Excavation, pump pour, drainage, block and beam floor, and blockwork to sole plate ready for the timber frame contractor for our client in Guildford. Datum Plus are excited for the next stage to return and construct the external brickwork and complete the hard landscaping.
We undertook the initial topographical land survey and produced design drawings for the proposal of a new sleeper wall to retain three new tennis courts. We are thrilled to working with 1st- Surface, providing our groundwork services through this next phase. Please see our on going project photos:
This project consisted of the surveying of two existing tennis courts on split levels at a site in Sunningdale. We were asked to produce a drawing showing sections through the existing site and court locations. We were asked to design a retaining structure to facilitate two tennis courts on a level platform. Proposed sections against existing ground levels have been drawn with the proposal of universal columns and sleeper walls.
Excavation and land contouring for the gardens of a new development in Lindfield. The gardens were profiled by our surveying team to our proposed design. We then excavated and removed any excess spoil from site. Topsoil was imported, compacted in layers and hand raked to new finished levels to receive grass seed.