Excavation, pump pour, drainage, block and beam floor, and blockwork to sole plate ready for the timber frame contractor for our client in Guildford. Datum Plus are excited for the next stage to return and construct the external brickwork and complete the hard landscaping.
We are please do be providing a full groundwork and surveying package for the development of two five bedroom houses, two detached garages in Ascot. Here are a few of our project photos.
Excavation and land contouring for the gardens of a new development in Lindfield. The gardens were profiled by our surveying team to our proposed design. We then excavated and removed any excess spoil from site. Topsoil was imported, compacted in layers and hand raked to new finished levels to receive grass seed.
We are installing 100 liner metres of structurally designed retaining wall using horizontally laid log rolls set between universal columns. The log rolls used come with a 30 year life warranty. The design takes into consideration the residence safety while maintaining the garden lawn areas. Please see our progressing project images.