This project consisted of the surveying of two existing tennis courts on split levels at a site in Sunningdale. We were asked to produce a drawing showing sections through the existing site and court locations. We were asked to design a retaining structure to facilitate two tennis courts on a level platform. Proposed sections against existing ground levels have been drawn with the proposal of universal columns and sleeper walls.
Excavation, pump pour, drainage, block and beam floor, and blockwork to sole plate ready for the timber frame contractor for our client in Guildford. Datum Plus are excited for the next stage to return and construct the external brickwork and complete the hard landscaping.
We are please do be providing a full groundwork and surveying package for the development of two five bedroom houses, two detached garages in Ascot. Here are a few of our project photos.
This external works project consists of the preparation for a new bowling, croquet and tennis courts. We are installing all service ducting and drainage as well as all external work finishes including paving and roads.