We are providing our surveying services on this 51 property development in Haywards Heath, West Sussex. The project consist of the setting out of a mix of residential houses and apartment’s. Our surveying division attend site producing a stock pile volume survey and cut and fill drawing. Our setting out engineers will accurately position roads, substructures and external works features to the proposed design drawings.
Excavation, pump pour, drainage, block and beam floor, and blockwork to sole plate ready for the timber frame contractor for our client in Guildford. Datum Plus are excited for the next stage to return and construct the external brickwork and complete the hard landscaping.
Datum Plus will be working alongside a leading timber frame contractor ‘Border Oak’ for in the quaint village of Chiddingfold. We are providing a full groundworks and surveying package from the initial site setup and piling services to the external works installation. Here are some of our project photos as we progress on site.
Excavation and land contouring for the gardens of a new development in Lindfield. The gardens were profiled by our surveying team to our proposed design. We then excavated and removed any excess spoil from site. Topsoil was imported, compacted in layers and hand raked to new finished levels to receive grass seed.
A great project undertaken in Horsmonden. This project involved the excavation for a new external swimming pool. Drainage and service trenching and the recycling of the arisings to contour the existing paddock area. It has been great building new working relationships. Keep posted for updated project images.