Excavation, pump pour, drainage, block and beam floor, and blockwork to sole plate ready for the timber frame contractor for our client in Guildford. Datum Plus are excited for the next stage to return and construct the external brickwork and complete the hard landscaping.
We are installing 100 liner metres of structurally designed retaining wall using horizontally laid log rolls set between universal columns. The log rolls used come with a 30 year life warranty. The design takes into consideration the residence safety while maintaining the garden lawn areas. Please see our progressing project images.
This external works project consists of the preparation for a new bowling, croquet and tennis courts. We are installing all service ducting and drainage as well as all external work finishes including paving and roads.
We are providing our surveying services on this 51 property development in Haywards Heath, West Sussex. The project consist of the setting out of a mix of residential houses and apartment’s. Our surveying division attend site producing a stock pile volume survey and cut and fill drawing. Our setting out engineers will accurately position roads, substructures and external works features to the proposed design drawings.
We are excavating a new 1700ft2 swimming pool in the beautiful area of Sevenoaks. All spoil will be remaining on site, we will then level and spread in the garden topping off with topsoil.
Datum Plus will be working alongside a leading timber frame contractor ‘Border Oak’ for in the quaint village of Chiddingfold. We are providing a full groundworks and surveying package from the initial site setup and piling services to the external works installation. Here are some of our project photos as we progress on site.