This project consisted of the surveying of two existing tennis courts on split levels at a site in Sunningdale. We were asked to produce a drawing showing sections through the existing site and court locations. We were asked to design a retaining structure to facilitate two tennis courts on a level platform. Proposed sections against existing ground levels have been drawn with the proposal of universal columns and sleeper walls.
We are providing our groundwork and surveying services for a private client in South Croydon. The groundwork package consist of initial site survey, setting out for our pilling contractor , reinforced raft slab foundations and drainage connections in to existing chambers
Excavation, pump pour, drainage, block and beam floor, and blockwork to sole plate ready for the timber frame contractor for our client in Guildford. Datum Plus are excited for the next stage to return and construct the external brickwork and complete the hard landscaping.
Datum Plus will be working alongside a leading timber frame contractor ‘Border Oak’ for in the quaint village of Chiddingfold. We are providing a full groundworks and surveying package from the initial site setup and piling services to the external works installation. Here are some of our project photos as we progress on site.