We are installing 100 liner metres of structurally designed retaining wall using horizontally laid log rolls set between universal columns. The log rolls used come with a 30 year life warranty. The design takes into consideration the residence safety while maintaining the garden lawn areas. Please see our progressing project images.
We are currently installing the first phase groundworks comprising of a 1200m2 area which includes the construction of a new entrance road, parking bays, brick retaining walls, ramps, services, footpaths, foul and storm water drainage.
We undertook the initial topographical land survey and produced design drawings for the proposal of a new sleeper wall to retain three new tennis courts. We are thrilled to working with 1st- Surface, providing our groundwork services through this next phase. Please see our on going project photos:
Datum Plus will be working alongside a leading timber frame contractor ‘Border Oak’ for in the quaint village of Chiddingfold. We are providing a full groundworks and surveying package from the initial site setup and piling services to the external works installation. Here are some of our project photos as we progress on site.
We provided our client with a full topographical land survey on a National grid ready for their Architect to over lay their proposed design for planning.
timber framedOur surveyors at Datum Plus are specialists in the setting out and levelling of the substructure brickwork and the sole plate on the oversite ready to receive the timber frame.