We provided our client with a full topographical land survey on a National grid ready for their Architect to over lay their proposed design for planning.
We are excavating a new 1700ft2 swimming pool in the beautiful area of Sevenoaks. All spoil will be remaining on site, we will then level and spread in the garden topping off with topsoil.
This external works project consists of the preparation for a new bowling, croquet and tennis courts. We are installing all service ducting and drainage as well as all external work finishes including paving and roads.
This project consisted of the surveying of two existing tennis courts on split levels at a site in Sunningdale. We were asked to produce a drawing showing sections through the existing site and court locations. We were asked to design a retaining structure to facilitate two tennis courts on a level platform. Proposed sections against existing ground levels have been drawn with the proposal of universal columns and sleeper walls.