Mark, Jack, Jake and Kieran have gained their dumper ticket qualification. Great things in business are never done by one person. They’re done by a team of people.
Mark, Jack, Jake and Kieran have gained their dumper ticket qualification. Great things in business are never done by one person. They’re done by a team of people.
This project consisted of the surveying of two existing tennis courts on split levels at a site in Sunningdale. We were asked to produce a drawing showing sections through the existing site and court locations. We were asked to design a retaining structure to facilitate two tennis courts on a level platform. Proposed sections against existing ground levels have been drawn with the proposal of universal columns and sleeper walls.
This external works project consists of the preparation for a new bowling, croquet and tennis courts. We are installing all service ducting and drainage as well as all external work finishes including paving and roads.
Datum Plus will be working alongside a leading timber frame contractor ‘Border Oak’ for in the quaint village of Chiddingfold. We are providing a full groundworks and surveying package from the initial site setup and piling services to the external works installation. Here are some of our project photos as we progress on site.
We are installing 100 liner metres of structurally designed retaining wall using horizontally laid log rolls set between universal columns. The log rolls used come with a 30 year life warranty. The design takes into consideration the residence safety while maintaining the garden lawn areas. Please see our progressing project images.
We provided our client with a full topographical land survey on a National grid ready for their Architect to over lay their proposed design for planning.
We are currently installing the first phase groundworks comprising of a 1200m2 area which includes the construction of a new entrance road, parking bays, brick retaining walls, ramps, services, footpaths, foul and storm water drainage.