Mark, Jack, Jake and Kieran have gained their dumper ticket qualification. Great things in business are never done by one person. They’re done by a team of people.
Mark, Jack, Jake and Kieran have gained their dumper ticket qualification. Great things in business are never done by one person. They’re done by a team of people.
Excavation, pump pour, drainage, block and beam floor, and blockwork to sole plate ready for the timber frame contractor for our client in Guildford. Datum Plus are excited for the next stage to return and construct the external brickwork and complete the hard landscaping.
We provided our client with a full topographical land survey on a National grid ready for their Architect to over lay their proposed design for planning.
We undertook the initial topographical land survey and produced design drawings for the proposal of a new sleeper wall to retain three new tennis courts. We are thrilled to working with 1st- Surface, providing our groundwork services through this next phase. Please see our on going project photos:
This external works project consists of the preparation for a new bowling, croquet and tennis courts. We are installing all service ducting and drainage as well as all external work finishes including paving and roads.
We are installing 100 liner metres of structurally designed retaining wall using horizontally laid log rolls set between universal columns. The log rolls used come with a 30 year life warranty. The design takes into consideration the residence safety while maintaining the garden lawn areas. Please see our progressing project images.