Mark, Jack, Jake and Kieran have gained their dumper ticket qualification. Great things in business are never done by one person. They’re done by a team of people.
We are excavating a new 1700ft2 swimming pool in the beautiful area of Sevenoaks. All spoil will be remaining on site, we will then level and spread in the garden topping off with topsoil.
We are installing 100 liner metres of structurally designed retaining wall using horizontally laid log rolls set between universal columns. The log rolls used come with a 30 year life warranty. The design takes into consideration the residence safety while maintaining the garden lawn areas. Please see our progressing project images.
Our surveying division completed this land survey in Andover, Hampshire. The survey has been requested by the Client to identify building, levels, existing furniture and boundary positions. We were asked on this project to produce the survey on a local grid. Our drawing will be used to overlay a new proposed site development.
We are providing our surveying services on this 51 property development in Haywards Heath, West Sussex. The project consist of the setting out of a mix of residential houses and apartment’s. Our surveying division attend site producing a stock pile volume survey and cut and fill drawing. Our setting out engineers will accurately position roads, substructures and external works features to the proposed design drawings.
This project consisted of the surveying of two existing tennis courts on split levels at a site in Sunningdale. We were asked to produce a drawing showing sections through the existing site and court locations. We were asked to design a retaining structure to facilitate two tennis courts on a level platform. Proposed sections against existing ground levels have been drawn with the proposal of universal columns and sleeper walls.