Mark, Jack, Jake and Kieran have gained their dumper ticket qualification. Great things in business are never done by one person. They’re done by a team of people.
Mark, Jack, Jake and Kieran have gained their dumper ticket qualification. Great things in business are never done by one person. They’re done by a team of people.
We undertook the initial topographical land survey and produced design drawings for the proposal of a new sleeper wall to retain three new tennis courts. We are thrilled to working with 1st- Surface, providing our groundwork services through this next phase. Please see our on going project photos:
Datum Plus will be working alongside a leading timber frame contractor ‘Border Oak’ for in the quaint village of Chiddingfold. We are providing a full groundworks and surveying package from the initial site setup and piling services to the external works installation. Here are some of our project photos as we progress on site.
Excavation, pump pour, drainage, block and beam floor, and blockwork to sole plate ready for the timber frame contractor for our client in Guildford. Datum Plus are excited for the next stage to return and construct the external brickwork and complete the hard landscaping.
Our surveying division completed this land survey in Andover, Hampshire. The survey has been requested by the Client to identify building, levels, existing furniture and boundary positions. We were asked on this project to produce the survey on a local grid. Our drawing will be used to overlay a new proposed site development.
We are please do be providing a full groundwork and surveying package for the development of two five bedroom houses, two detached garages in Ascot. Here are a few of our project photos.