We are providing our groundwork and surveying services for a private client in South Croydon. The groundwork package consist of initial site survey, setting out for our pilling contractor , reinforced raft slab foundations and drainage connections in to existing chambers
We are currently installing the first phase groundworks comprising of a 1200m2 area which includes the construction of a new entrance road, parking bays, brick retaining walls, ramps, services, footpaths, foul and storm water drainage.
We are providing our surveying services on this 51 property development in Haywards Heath, West Sussex. The project consist of the setting out of a mix of residential houses and apartment’s. Our surveying division attend site producing a stock pile volume survey and cut and fill drawing. Our setting out engineers will accurately position roads, substructures and external works features to the proposed design drawings.
This project consisted of the surveying of two existing tennis courts on split levels at a site in Sunningdale. We were asked to produce a drawing showing sections through the existing site and court locations. We were asked to design a retaining structure to facilitate two tennis courts on a level platform. Proposed sections against existing ground levels have been drawn with the proposal of universal columns and sleeper walls.
Excavation and land contouring for the gardens of a new development in Lindfield. The gardens were profiled by our surveying team to our proposed design. We then excavated and removed any excess spoil from site. Topsoil was imported, compacted in layers and hand raked to new finished levels to receive grass seed.
A great project undertaken in Horsmonden. This project involved the excavation for a new external swimming pool. Drainage and service trenching and the recycling of the arisings to contour the existing paddock area. It has been great building new working relationships. Keep posted for updated project images.
timber framedOur surveyors at Datum Plus are specialists in the setting out and levelling of the substructure brickwork and the sole plate on the oversite ready to receive the timber frame.