We are please do be providing a full groundwork and surveying package for the development of two five bedroom houses, two detached garages in Ascot. Here are a few of our project photos.
Excavation, pump pour, drainage, block and beam floor, and blockwork to sole plate ready for the timber frame contractor for our client in Guildford. Datum Plus are excited for the next stage to return and construct the external brickwork and complete the hard landscaping.
We are excavating a new 1700ft2 swimming pool in the beautiful area of Sevenoaks. All spoil will be remaining on site, we will then level and spread in the garden topping off with topsoil.
We are providing our groundwork and surveying services for a private client in South Croydon. The groundwork package consist of initial site survey, setting out for our pilling contractor , reinforced raft slab foundations and drainage connections in to existing chambers