We are providing our surveying services on this 51 property development in Haywards Heath, West Sussex. The project consist of the setting out of a mix of residential houses and apartment’s. Our surveying division attend site producing a stock pile volume survey and cut and fill drawing. Our setting out engineers will accurately position roads, substructures and external works features to the proposed design drawings.
We are excavating a new 1700ft2 swimming pool in the beautiful area of Sevenoaks. All spoil will be remaining on site, we will then level and spread in the garden topping off with topsoil.
We are installing 100 liner metres of structurally designed retaining wall using horizontally laid log rolls set between universal columns. The log rolls used come with a 30 year life warranty. The design takes into consideration the residence safety while maintaining the garden lawn areas. Please see our progressing project images.
We are providing our groundwork and surveying services for a private client in South Croydon. The groundwork package consist of initial site survey, setting out for our pilling contractor , reinforced raft slab foundations and drainage connections in to existing chambers
We undertook the initial topographical land survey and produced design drawings for the proposal of a new sleeper wall to retain three new tennis courts. We are thrilled to working with 1st- Surface, providing our groundwork services through this next phase. Please see our on going project photos: