We are delighted to be working within this luxurious development for the Royalton Group. We will be providing surveying and groundwork services within the woodlands walk, walled garden areas as well as external works to the marketing suite, paving to linking developments, and service trenching.
Datum Plus will be working alongside a leading timber frame contractor ‘Border Oak’ for in the quaint village of Chiddingfold. We are providing a full groundworks and surveying package from the initial site setup and piling services to the external works installation. Here are some of our project photos as we progress on site.
Excavation and land contouring for the gardens of a new development in Lindfield. The gardens were profiled by our surveying team to our proposed design. We then excavated and removed any excess spoil from site. Topsoil was imported, compacted in layers and hand raked to new finished levels to receive grass seed.
This external works project consists of the preparation for a new bowling, croquet and tennis courts. We are installing all service ducting and drainage as well as all external work finishes including paving and roads.
stockpile volumesDatum Plus will survey your stockpile volumes producing a DWG and PDF drawing highlighting quantities, materials and stockpile locations.